Consultant/Contact Mr. Murray Thomas Dept of Conservation Ruakapuka Area Office 03 693 1014
Value of Work $20,000
Description Prepare car parks (2) at Mt Sunday and cover with compacted gravel. Reform Lake Clearwater access road and recover with compacted gravel
Relevance Roading project
ProjectSlip remedial work Mt Lyford State Highway 70
Client Hurunui District Council – sub-contracted to Fulton Hogan Limited
Completion Date April 2009
Consultant/Contact Paul O’Meara, Fulton Hogan Ltd 03 349 7039
Value of Work $65,000
Description Excavate from Mason River and lay material in engineered fill.
Relevance Excavation from river and engineered fill
ProjectStanfields Stud Bangor Estate Developmemt
Client Stanfields Bushey Park Limited, Palmerston
Completion Date September 2008
Consultant/Contact Mr. Clive Jermy 03 465 1022
Value of Work $ 182,186
Description Developing races, deer shed site and car park and associated works including culvert installation
Relevance Site development work
ProjectSynlait Milk Limited – SH 1 & Heslerton Road Up-grade – sub-contract to Fulton Hogan Ltd
Client Synlait Milk Limited
Completion Date May 2008
Consultant/Contact Mr. Paul O’Meara – Fulton Hogan 027 285 2751 Mr. Chris Johnson – Opus International
Value of Work $ 200,000
Description Site clearing of trees, topsoil and rubbish including tip. Reinstate and form roadways and realigned railway embankment using material from borrow pit. Reform and shape landscape bund and re- topsoil.
Relevance Site development and roading to close tolerances
ProjectLogburn Road to Big River and Coal preparation Site (Joint Venture with Rosco Contractors, Reefton)
Client Pike River Coal Company
Completion Date May 2007
Consultant/Contact Mr. Les McCracken – Engineer to Contract 0274 328926
Value of Work $ 4.0 m
Description Establishing access through bush, forming road including multiple culverts, supply and lay pavement materials, road sealing and finishing. 4.3 km road length plus coal preparation plant site works, transformer pad and site amenities
Relevance Large scale roading contract with environmental constraints.
ProjectsStopbank up-grade Stages 2, 3 & 6 – Ashburton Town
Client Environment Canterbury
Completion Date February 05 – Stage 2, January 06 – Stage 3 & April 2007 –Stage 6
Consultant/Contact Mr. Ian Heslop - Engineer03 3727201
Value of Work $106,274 Stage 2, $164,718 – Stage 3 & $153,500 .00 – Stage 6
Description Removal of old stopbank and rebuild using existing material and gravel imported from Ashburton River. Compaction testing and requirements required.
Relevance Bulk earthworks to close tolerances and compaction criteria with constraints on maintaining integrity in event of flood situation. Local Authority contract with resource consent implications.
ProjectsStopbank up-grade Stage 2A & 2B - Belfast
Client Environment Canterbury
Completion Date September 2006 – 2A & September 07 – 2B
Consultant/Contact Mr. Ian Heslop - Engineer03 3727201
Value of Work $ 432,350.00 – 2 A & $492,720.00 – 2B
Description Removal of old stopbank and rebuild using existing material and gravel imported from Waimakariri River. Fencing and cattle yard replacement.
Relevance Bulk earthworks to close tolerances and compaction criteria with constraints on maintaining integrity in event of flood situation. Local Authority contract with resource consent implications.
ProjectRolleston Recovery Park, Selwyn District Council
Client Sub-contracted to Smith Crane and Construction
Completion Date January 2006
Consultant/Contact Mr. G EssenbergSelwyn District Council 03 324 8080 Tim Smith 03 359 7759
Value of Work $200,394.00
Description Topsoil removal, cut and fill sub-grade to required level and compaction. Supply, lay and compact AP65 and AP40. Replace topsoil and re-grass.
Relevance Site development work
David Morris Earthworks (DME) are relatively recently established in the Canterbury area operating from their base in Hororata. In the seven years of being established in the area, DME have undertaken:-
Car parks and access road up-grading for Department of Conservation at Mt Sunday and Lake Clearwater.
Plantation stumping and clearing to grassing stage for a number of landowners in Selwyn area including Dairy Holdings, Grasslands Canterbury, Quartz Hill Station and Plains Holdings employing specially developed attachments to 33t bulldozers.
Up-grade Carneys Road, Alford Forest for Ashburton District Council.
Dairy farm conversion involving shelter belt removal and destumping, track formation and shed site development for Grasslands, Te Pirita.
Access road, track and car park development at Lake Heron, Alford Forest, Rangitata River and Lake Emma for Department of Conservation.
Stopbank up-grade Ashburton and Waimakariri Rivers for Environment Canterbury – five contracts.
Flood bank construction Kowhai and Hapuka Rivers, Kaikoura for Environment Canterbury.
Sports field development, Heathcote for Christchurch City Council.
Land restoration and retention basin construction for Selwyn District Council at Tai Tapu.
Overburden stripping for Ravensdown Fertiliser Co-operative at their Kakahu limestone quarry near Geraldine which also involved an engineered, compacted fill.
Land clearing and levelling alongside the Waimakariri River for Environment Canterbury.
Sub-contracted to Earthworks Marlborough constructing large irrigation dam in the Wairau River valley near Blenheim.
Dairy Conversions for Dairy Holdings Limited in Hororata and Oxford area.
Water storage dam construction, Mount Torlesse Station.
All of the above works have to some degree involved compliance with consents, adherence to set quality standards and procedures with the works to completed to time schedules and budget.